EICR
EICR software that follows the BS7671 model form
A digital EICR form built to BS7671 — the 30-column schedule of circuit details and test results, the schedule of inspection, coded observations — completed on site and attached to the job it came from. Schedule the inspection, do the report, raise the invoice: one record, start to finish.
Private beta · Free to join · No card required
What the EICR editor includes
Everything the model form asks for, plus the parts that make it faster on site than paper.
30-column circuit schedule
The full BS7671 30-column schedule of circuit details and test results, board by board — not a simplified grid you end up annotating by hand.
- ›Circuit details and test results per board
- ›The same columns as the model form
- ›Completed on site as you test
Schedule of inspection with code grading
Work through the schedule of inspection item by item and grade observations with classification codes, so the condition of the installation is recorded the way the form intends.
- ›Item-by-item schedule of inspection
- ›Observations graded with classification codes
- ›A report that reads like the model form
AI Suggest observations from photos
Photograph the board or the test setup and AI Suggest drafts observations from the photos. The engineer reviews, edits and decides what goes on the report — it saves the typing, not the judgement.
- ›Observations drafted from board and test photos
- ›Engineer reviews and accepts each one
- ›Less thumb-typing in a cold cupboard
Test instrument register
A per-board test instrument register that snapshots the instrument's make, model and serial at the moment of issue — the certificate records exactly what it was tested with.
- ›Instrument register held per board
- ›Make, model and serial snapshotted at issue
- ›No retrospective guessing at serial numbers
Accreditation gating
EICR issue is gated by engineer accreditation. An engineer without the right scheme registration — NICEIC or NAPIT — can't issue the report, so issued paperwork stays tied to a registered engineer.
- ›Issue gated by scheme registration
- ›NICEIC and NAPIT accreditation recorded
- ›No unqualified sign-offs slipping through
Signature, PDF and send history
The customer signs on the PDF itself, and the finished EICR is emailed from the platform with a full send history — proof of what was sent, to whom, and when.
- ›Customer signature on the certificate PDF
- ›Emailed direct from the record
- ›Full send history kept against the job
The EICR inside the job workflow
An EICR app on its own still leaves you booking the visit in one place and invoicing in another. Here the report is one step in a job that runs end to end.
1. Schedule the inspection
The inspection is booked on a capacity-aware diary and assigned to an engineer by trade and availability.
Job scheduling software →
2. Complete it on site
The engineer works through the schedules in AFPro, the AllForProjects field app — even offline, with the queue syncing when signal returns.
The AFPro mobile app →
3. Invoice the same record
When the job completes, the invoice is created from it automatically — the EICR and the bill come off the same job.
Invoicing & payments software →
EICRs are unlimited in every seat, with no per-certificate fees — see how pricing will work.
Who it's for
Built for UK electrical contractors doing periodic inspection and testing — from a sole trader with a van to a team of engineers on the diary. See the full picture on software for electricians, or browse the rest of the set on electrical certificate software — EIC, Minor Works, EV Charger, Emergency Lighting and more.
EICR software FAQs
Is the EICR a BS7671 model form? +
Yes. The editor matches the BS7671 model form, including the 30-column schedule of circuit details and test results and the schedule of inspection with code grading — so the finished report reads the way a scheme assessor or client expects.
Can I complete an EICR offline? +
Yes. AFPro, the AllForProjects field app, keeps working with no signal — basements, plant rooms, buildings with patchy 4G — and queues your work offline, syncing when signal returns. You don't lose a test result to a dead spot.
Is there a per-certificate fee or a limit on EICRs? +
No. The plan is simple per-active-seat pricing with everything included — unlimited certificates, jobs, quotes and invoices, and no per-certificate fees. Numbers will be published at launch, and the waitlist hears first.
Who can issue an EICR in AllForProjects? +
Only an engineer with the right accreditation. Certificate issue is gated by scheme registration — NICEIC or NAPIT — so an engineer without it cannot issue the report.
Does the AI write my observations for me? +
AI Suggest drafts observations from your board and test photos, and the engineer reviews, edits and decides what goes on the report. It takes the typing out of observations — the inspection judgement stays with the person who did the inspection.
How does the customer get the report? +
The customer signs on the PDF and the EICR is emailed from the platform, with a full send history kept against the job — so you can always show exactly what was delivered and when.
Do your next EICR without the paperwork evening
AllForProjects is in private beta ahead of public launch. Join the waitlist and we'll let you know the moment it opens.
Or talk to us first.